Block 02 Statement

This entry records a completed, admissible round-trip transition executed under declared Continuity Physics and Structural Geometry.

This entry is testimony, not definition.
It proves operability of the prior layers without modifying them.


Initial State

  • Origin Node: v1.0
  • Density: High
  • Coherence: Stable
  • Return Vector: Present

Outbound Transition

  • Transition: v1.0 → v1.1
  • Admissibility: Passed all Constitutional invariants
  • MLP: Present
  • Identity: Preserved
  • Traceability: Complete

Domain Transition

  • Target Node: Moon Domain
  • Density Classification: High
  • Envelope Status: Within admissible boundary
  • Edge Validity: Confirmed
  • Coms Matrix: Maintained

Return Transition

  • Transition: Moon Domain → v1.1
  • Return Vector: Preserved and executed
  • Coherence Reconstruction: Successful
  • Meaning Integrity: Intact
  • Consequence Monotonicity: Maintained

Result

  • Round-trip completed without invariant violation
  • No drift detected
  • Identity preserved across all states
  • Navigable envelope expanded by validated node inclusion

Scope of Authority

This testimony:

  • validates Structural Geometry,
  • confirms Constitutional Physics,
  • demonstrates MLP sufficiency.

It does not:

  • redefine rules,
  • introduce new geometry,
  • expand scope beyond this execution.

Immutability Clause

This testimony is immutable once posted.
Any future execution must be recorded as a new Block 02 entry.


Closure

This entry confirms that the declared continuity system supports admissible outbound transition, safe traversal, and guaranteed return.

Order Your Life-Safety Sample Kit

X